Fehmarn Link

Ensuring constructability and industrialized construction with BIM and VDC on the world's longest immersed tunnel

The Fehmarnbelt Fixed Link will consist of a motorway and rail connection, including an 18 km long tunnel, that will allow faster and safer travel between Scandinavia and continental Europe. It will be the world’s longest immersed tunnel and the longest tunnel for both road and rail traffic. The Owner, Femern A/S, has appointed Femern Link Contractors (FLC) for the Design & Construction of the immersed tunnel, the tunnel portals, and ramps.

CN3 has been commissioned by FLC during tender, design, and execution with the purpose of ensuring constructability, optimizing design, and utilizing digital fabrication to reduce waste, and ensure a high degree of prefabrication and industrialized construction methods.

The project is a large scale demonstration of what can be achieved, when Virtual Design & Construction is used as a driving force towards a more industrialised construction of large scale infrastructure projects.

The project is a large scale demonstrator of what can be achieved, when Virtual Design & Construction is used as a driving force towards a more industrialised construction of large scale infrastructure projects.

Reference data
Femern A/S
COWI
FLC
7,5 BN. EURO
Tender, Design, and Execution
Services
Digital Construction management
BIM&VDC coordination
Model and drawing automation
Parametric design
Digital Fabrication
Constructability and methods validation
BIM systems and Technology Implementation